The problem of electricity is not due to generation. we have the capacity to generate a lot of electricity. The problem lies with the transmission entity and the discos lack of metering. The electricity value chain model is never going to work in Nigeria and needs to be changed. We a model that allows any company to generate, transmit and distribute, so that we don’t get the blame game and we get a power company that is responsible for all aspect of the value chain.